Added: 2 years ago
From: Gagarin737
Views: 3,701
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (15)

Sign In or Sign Up now to post a comment!
  • Where was the fuel tank?

  • @stevenesmond2 The fuel tank (20 USG) is in the fuselage The reason for that is that the wings are removable in just 5 minutes ; watch?v=AnWrXKfh_XM (prototype)

  • Who is that boy in the right, down corner at 0:38?

  • @ThePlanespotter1 That's my son Bas (11 years/2009). He did most of the rivets in the wingpanels.

  • Comment removed

  • great vid

  • Does the RV-12 use all blind rivets?

  • About 12000 blind rivets and a couple of hundred solid rivets, mostly AN426AD3 to fasten the nutplates and some AN426AD4 for the tailcone and flapbrackets (e.g. 34sec). All easy to squeeze with a handsqueezer.

  • I am thinking of building an RV 12... Your videos are great you are a genius. Thanks for sharing.

  • Very cool, great soundtrack after all.

    Did it take much extra time filming the process?

  • It didn't take any more time at all. The camera (Canon350D) is standing on a tripod with a wireless remote control (also Canon). You just step aside and press the button after every step. The rest is done in iMovie; just put all the pictures on a timeline and choose the speed option.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more