In 1988 the line 1150 kV an alternating current (50 Hz) is started up in operation. The new hydroelectric power plant, with lines 1500 kV a direct current now is under construction. You abroad all so are surprised to China when it is all was in the USSR 30 years ago... I laugh at these records which don't belong to them. All only also do that copy.
The Soviet single-phase transformer (it is necessary three transformers on all phases), 1150 kV, 50 Hz in weight more than 400 tons, is made in 1986. forca.com.ua/images/trans/praktika/2009/transformator-372.gif
This has been flagged as spam show
In 1988 the line 1150 kV an alternating current (50 Hz) is started up in operation. The new hydroelectric power plant, with lines 1500 kV a direct current now is under construction. You abroad all so are surprised to China when it is all was in the USSR 30 years ago... I laugh at these records which don't belong to them. All only also do that copy.
HIGHVAASTECH 8 months ago
This has been flagged as spam show
The Soviet single-phase transformer (it is necessary three transformers on all phases), 1150 kV, 50 Hz in weight more than 400 tons, is made in 1986. forca.com.ua/images/trans/praktika/2009/transformator-372.gif
HIGHVAASTECH 8 months ago