excavation and pour min 3 days, crane min 12000, this house was assembled in 2 days but it took ,ore than 30 days to put this in shop . Interesting same time this is not6 the answer to low cost
In this case it was fairly standard concrete/steel raft foundation, approx 2 weeks with associated ground & drainage works as it was a tricky site. It very much depends on the particular ground conditions and type of foundation specified how much time it takes.
This has been flagged as spam show
excavation and pour min 3 days, crane min 12000, this house was assembled in 2 days but it took ,ore than 30 days to put this in shop . Interesting same time this is not6 the answer to low cost
PiotrZCalka 3 months ago
Comment removed
PiotrZCalka 3 months ago
i like of it says day 4 at 2:20.
italgino86 5 months ago
n00bs using prefabs in radiant... Make your own...
KakelaXD 7 months ago
The slab is already laid. Is that an additional day?
artdude102 7 months ago
In this case it was fairly standard concrete/steel raft foundation, approx 2 weeks with associated ground & drainage works as it was a tricky site. It very much depends on the particular ground conditions and type of foundation specified how much time it takes.
shamin39 7 months ago
pls what is the name of this germany company?
saeed227 3 years ago