I heard that the engineer mismarked the brace position that should go directly under the outriggers on the floor below, and they cought him remarking them in chalk in the correct position immediately after the incident. Tisk tisk.
This is the one at Newcastle Australia? The engineers had propped the lower floors and as far as I knew, they marked the top floor with X's for the outriggers. This crane couldn't be dismantled because of it's size (300t I believe) so they had to demolish the car park around it and go from there. It was one of the safety topics in my advanced riggers course.
Will the composer of this song please stand over near the wall... the firing squad is on it's way ..... .......why do people think we like this tune? ---- are you tone deaf?
looks to me like they didn't take into account the load put on the outrigger with the crane being scoped that far out with the weight on just one foot. you got to take the load moment into consideration or you'll put yourself in a bind when workin on soft ground or a floor with empty space beneath you.
There are soooo many things done wrong here. Apparently this was the first job for this brand spanking new LTM1250 set up with full stack and the kidney's to boot. I can't remember exactly the weight but I think it's around 212,000 lbs of ctwt alone! Shoring wouldn't have done squat here. That much weight concentrated in one spot on a lousy parkade? And this was not only the operator at fault, no crane this size gets dispatched with one phone call. Remarkably stupid.
it was not the crane operators fault, it was the engineers... they signed off on the crane to be set up there and they did have props, but not enough for the load there were carrying :)
BULL. The operator is 100% to blame for setting that up over a room or crawl space. If they said with proper shoring it would be ok the operator should have checked it before setting up. 100% OPERATOR F-UP
a crane that size should never be on a slab unless it was adequately propped below! no steel mats either.the operator needs a fucking with a sledge.i,d have liked to have seen the method statement for that job!
yes pads not down big mistake. i drive a demag ac200-1 from my exp concrete is the most misleading surface a crane can set up on you never know whats under it. and as for the comment on the safety officer in my country the driver has the final say on all such issues, these guys merely advise. hope drivers ok smashing machine.
engineer onsite overrode operator about using pads under the outriggers and signed off on the setup. they had already done some panels aswell. slab fault i think.
bigjakesrq is right it was setup on a suspended slab that was only 120 thick where the first outrigger punched through and it took 4 hours for it to go right through so it would be a boring vid
I heard that the engineer mismarked the brace position that should go directly under the outriggers on the floor below, and they cought him remarking them in chalk in the correct position immediately after the incident. Tisk tisk.
fiddletownjoel 1 month ago
Fuck this song!
muthafuckindevilsson 4 months ago
Fuck this fucking song!
HiImCaysE 5 months ago
OH NOOOOOOOOO....not that song AGAIN.........Life is painful enough without it !!!!!!
darklab5 7 months ago
thumbs up if you muted it after 1 second
pastorgeorgem 7 months ago
@pastorgeorgem
wow that actually a thumps up that i gave ^^
predatortheme 7 months ago
@predatortheme overused song bad song enuf said it reminds me of 2 squirrels mating and fingernails on a chalkboard combined
pastorgeorgem 7 months ago
@pastorgeorgem it reminds me of boredoom. being tired . and pissed off. thats why i cant hear it anymore
predatortheme 7 months ago
amateurish..
Kumileimasin 8 months ago
This is the one at Newcastle Australia? The engineers had propped the lower floors and as far as I knew, they marked the top floor with X's for the outriggers. This crane couldn't be dismantled because of it's size (300t I believe) so they had to demolish the car park around it and go from there. It was one of the safety topics in my advanced riggers course.
ph33x 9 months ago
Will the composer of this song please stand over near the wall... the firing squad is on it's way ..... .......why do people think we like this tune? ---- are you tone deaf?
pyrofella 9 months ago
Muted and thumbs down 1 second into the video, you don't need psychic power to guess why.
KCzz15 9 months ago
Why the gay song
COLLOFDUTYWAW 9 months ago
f*cking song!
fireeater999cmcc 10 months ago 8
Arghh straight away when the video started i HAD to mute my speakers
MrJED698 10 months ago
I boycot every video that plays this music
imautuber444 11 months ago 2
Dumb ass, no matts for outriggers, not set up over the headers, must be none union RATS
willtcrane 11 months ago
no need to waste bandwidth and storage space with a video only to display some pictures. I hate those.
zyxy45 1 year ago
Ask the engineer and surveyor who positioned the crane rather than blaming the operator.
Froggtherigger 1 year ago
why does this song go by many different names?
thewii552 1 year ago
looks to me like they didn't take into account the load put on the outrigger with the crane being scoped that far out with the weight on just one foot. you got to take the load moment into consideration or you'll put yourself in a bind when workin on soft ground or a floor with empty space beneath you.
volFD59 1 year ago
this is the reason you have floor analysis done and you always use spreader plates the operator , owner, and engineers should have know better
cornbread776 1 year ago
That was Rouse Hill shops under constuction..
SP2333 1 year ago
Well..... hindsight is a wonderful thing!! I bet he uses his spreader plates NEXT time though!! ;-)
Boysiesbargains 1 year ago
There are soooo many things done wrong here. Apparently this was the first job for this brand spanking new LTM1250 set up with full stack and the kidney's to boot. I can't remember exactly the weight but I think it's around 212,000 lbs of ctwt alone! Shoring wouldn't have done squat here. That much weight concentrated in one spot on a lousy parkade? And this was not only the operator at fault, no crane this size gets dispatched with one phone call. Remarkably stupid.
jokeco68 2 years ago 2
shoring.....
sickasylum 2 years ago
it was not the crane operators fault, it was the engineers... they signed off on the crane to be set up there and they did have props, but not enough for the load there were carrying :)
ENGINEERS FUCK UP!!!
samihhadid 2 years ago
BULL. The operator is 100% to blame for setting that up over a room or crawl space. If they said with proper shoring it would be ok the operator should have checked it before setting up. 100% OPERATOR F-UP
yourafrickenidiot 2 years ago
Imbecille,
MrMarkdickinson 2 years ago
license came from a popcorn bag
sansdanger 2 years ago
a crane that size should never be on a slab unless it was adequately propped below! no steel mats either.the operator needs a fucking with a sledge.i,d have liked to have seen the method statement for that job!
milwyr 2 years ago
gay music
pologti98 2 years ago 24
someone's going to get a big kick in the ass over that.
AceTowerHire 2 years ago
yes pads not down big mistake. i drive a demag ac200-1 from my exp concrete is the most misleading surface a crane can set up on you never know whats under it. and as for the comment on the safety officer in my country the driver has the final say on all such issues, these guys merely advise. hope drivers ok smashing machine.
minogue307 2 years ago
oi can someone tell me that songs XD cheers
pyrodownhiller 2 years ago
breath machine
esas09 2 years ago
engineer onsite overrode operator about using pads under the outriggers and signed off on the setup. they had already done some panels aswell. slab fault i think.
xckooope 3 years ago
bigjakesrq is right it was setup on a suspended slab that was only 120 thick where the first outrigger punched through and it took 4 hours for it to go right through so it would be a boring vid
phatpaul82 3 years ago
how stupid. not to reinforce under the concrete....
xxxavier63 3 years ago
It should have never been on that in the 1st place. Not even to drive over it. Much less set up on it.
bigjakesrq 3 years ago
the reason why that crane fell through the floor is because the floor was not reinforecd alot
001dylan 3 years ago
brand new 250 t liebherr they should of atleast put pads underneeth the outriggers.
250quadzilla 3 years ago
yer m8
kazonda07 3 years ago
verry nice :D
that was in sydney ey :D
iwannabawannab 3 years ago
we need video lol
BFTATB 3 years ago