Added: 3 years ago
From: MrCraneInc
Views: 29,427
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (10)

Sign In or Sign Up now to post a comment!
  • I believe that it,s possible but only in optimal conditions like space , boom and counterweight configurations and most important i see a organised team where everywone now,s his job to dismantle this machine.But it,s still a hell of a crane i operate a Liebherr LR 1160 in the Netherlands but i won,t mind to change.

  • Caterpillars self-demontage is unique!

  • pretty quick but was it safe really

  • we would like to know if the engineer who know to operate this to dismantle is in dubai as we have a same type of crane which needs to operate and dismantle

  • We have a very adept crew at MrCrane.com.  feel free to contact DennyQ@MrCrane.com for further information

    DQ

  • musics shit...great to see the machine pulling itself apart with out any other crane assisting... we usauly put these 2250 together with a 20t franna crane helping with the unloading of the trucks ..putting the counter wieghts and boom on... On most site in australia you have to wear a harnes or use a boom lift.. Its all about milking it.lol.

    great series of photos

  • just a baby.

  • only got two hours cause the trucks were all lined up and mr crane only has a few cranes. easy to say u can rig it down in 2hrs in a wide open area. with no one around..honestly dont believe this

  • cool video,I've hauled the "upper"of one of these before,Local 721,IUOE

  • quite possibly the gayest music of all time for a crane break out.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more