Added: 3 years ago
From: tnglobe25
Views: 696
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (1)

Sign In or Sign Up now to post a comment!
  • LATEST UPDATE As of July 2009: After accomplishing a massive, 30-meter deep excavation for the buildings 7 basement levels, and with construction works reaching the ground level in May, Gramercy is officially on its way to creating a silhouette in the next coming months over the Makati skyline.

    Construction at the Gramercy site has ramped up as rebar works have reached the second floor of the buildings sub-structure.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more