Added: 4 years ago
From: wsdot
Views: 1,819
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (5)

Sign In or Sign Up now to post a comment!
  • What an expensive eyesore. Either repair the current Viaduct or tear it down and rout traffic around the city. NYC almost went this route, proposing elevated highways through downtown neighborhoods. Fortunately, they opted to route highways outside the city.

    The tunnel will be a complete disaster when the digging destroys building foundations.

  • The elevated roadway is the only cost effective solution the tunnel cost to much and would take forever to build. The construction should be done with a plan to reroute traffic via new streamlined water front streets prior to construction and precast sections for rapid construction.

  • I agree but they already agreed on a tunnel

  • seriously, we need a tunnel.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more