Sort by time | Sort by thread (beta)

Link to this comment:

Share to:
see all

All Comments (4)

Sign In or Sign Up now to post a comment!
  • DR3104, great videos. I wonder why JR didn't do this work when they made this section elevated. Also, do you know if the freight connector line between Tambaguchi and Nishioji is in use?

  • Yes, I know the connector line.

    In 1990s, extra rapid train "HOLIDAY" were operated. "Sagano & Arashiyama HOLIDAY" of them, ran the connector line, so this train didn't stop at Kyoto station.

    Now, Sagano Line is construction to double track, because the line has not enough track capacity.

    And, train delay doesn't want to affect to other lines.

    Because above reasons, lately this train is not operated, I think so.

  • Nice downtown section!

    I can see they're working with a new track ... maybe from single to double track or just repair and renovation?

    Thanks for sharing.

  • Thank you for your visiting.

    The area along this Sagano Line grew from the late 1990's because the line was completed electrification work in 1996.

    Before that, only diesel-powered trains ran this line.

    Now the line is under single to bouble track construction, the construction will be completed in the spring of next year, 2010.

Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more