over kill!!! i think you need somemore chains. 1 on each end of the track and a chain over the bucket away u go. i wouldn't put that many on a 365 excavator
a little overkill on the chains, you could use 1/2'' binders with a WLL of #15,000 on the inside of track to outer edge of trailer pulling in proper direction. And two grade 100 alloy 1/2'' chains with above mentioned binders on the boom. Giving you #60,000 of WLL and reduced WLL. Good enough for a #85,000 machine being the WLL stated above is legal for a #120,000 load, and much easier and faster. I haul 3-5 of these a day, just saying how I do it. There is nothing wrong with your way using G70
over kill!!! i think you need somemore chains. 1 on each end of the track and a chain over the bucket away u go. i wouldn't put that many on a 365 excavator
dhah555 8 months ago
@dhah555 i had to go overrough roads and steep inclines on turns.
RadioOneTrucking 4 weeks ago in playlist More videos from RadioOneTrucking
a little overkill on the chains, you could use 1/2'' binders with a WLL of #15,000 on the inside of track to outer edge of trailer pulling in proper direction. And two grade 100 alloy 1/2'' chains with above mentioned binders on the boom. Giving you #60,000 of WLL and reduced WLL. Good enough for a #85,000 machine being the WLL stated above is legal for a #120,000 load, and much easier and faster. I haul 3-5 of these a day, just saying how I do it. There is nothing wrong with your way using G70
sturtevant9223 9 months ago
hey is that trailers neck detachable by hydro or mech?
dontdriveforfree 1 year ago
@dontdriveforfree hydro
RadioOneTrucking 4 weeks ago in playlist More videos from RadioOneTrucking
Amazing!
satothequeen 1 year ago
Outstanding video
DCCargoMall 1 year ago