@dazedmonkeydude - not being funny mate but if you need wickets up or countdowns then you gotta get the closure on!! Some company's wont pay you if you don't, not mentioning annoy names... RENTEQ!!!! Fair play to you mate, all this health and safety bollocks has stopped the adrenaline of A/B work now the highways agency/bods that write chapter 8 are bringing countdowns down to : 1 mile, 400yards, 200yards, lead taper with some stupid staggered back wall, seen it in action on a forest TM closure
If you were in my squad and carried out a stunt like that I'd have left you on the reserve ya muppet and besides , where was the lead op when the "dancin' queen " was performing ?
Ahhh the good old dance with the devil. No way you had the count lol yet you still went on pmsl pressure from above makes us do things we know we shouldn't. I've had a 15 mile tailback as I went on before we got the count fuck em
@churchill5493 PMSL. There wasnt any pressure churchill,Just wanted the job on so we could get back to the static and get even more STONED than we already were.LOL
@TheShiste I must get that thing in the middle of the motorway but how am i supposed to stop traffic? Ahhhh we are lazy buggers no need just get ya ass into run gear ! And besides its the M1 its to busy and he dont want to wreck our little lovely truck !
Don't know at what speed this video is taken, but that idiot should not be putting up the advanced on any Traffic Management. Everything has its limits and by the look of it there is no way those operatives could have got a traffic count to allow them to put that TM on. You want to get yourselves killed, go ahead, but don't include the rest of us.
@jhh48 Lol The video was recorded at normal speed ,it was recorded about 7 yrs ago when health and safty was a little more relaxed, A time when ya just got the job done. As it happens 1st cone was 9.00 and we didnt start with the signs till 9.35 and yes we got the count.Not sure how long youv done tm im guessing 10 mins not 10 yrs. This was taken on the m1 and that particular stretch of road was very busy all the time,if we hadnt gone for it the contractor would STILL be waiting now.
@dazedmonkeydude - not being funny mate but if you need wickets up or countdowns then you gotta get the closure on!! Some company's wont pay you if you don't, not mentioning annoy names... RENTEQ!!!! Fair play to you mate, all this health and safety bollocks has stopped the adrenaline of A/B work now the highways agency/bods that write chapter 8 are bringing countdowns down to : 1 mile, 400yards, 200yards, lead taper with some stupid staggered back wall, seen it in action on a forest TM closure
davenato56 1 month ago
Muppet.
Ive seen people die do that.
Its one slip and youve fucked it.
dazedmonkeydude 4 months ago
Muppet.
Ive seen people die do that.
Its on slip and youve fucked it.
dazedmonkeydude 4 months ago
If you were in my squad and carried out a stunt like that I'd have left you on the reserve ya muppet and besides , where was the lead op when the "dancin' queen " was performing ?
sapper2949 10 months ago
That's how not to do it.
thaiboxer1232 1 year ago
Traffic counts in TM, that's just on paper!!!
AmbushSoD 1 year ago
Ahhh the good old dance with the devil. No way you had the count lol yet you still went on pmsl pressure from above makes us do things we know we shouldn't. I've had a 15 mile tailback as I went on before we got the count fuck em
churchill5493 1 year ago
@churchill5493 PMSL. There wasnt any pressure churchill,Just wanted the job on so we could get back to the static and get even more STONED than we already were.LOL
TheShiste 1 year ago
@TheShiste I must get that thing in the middle of the motorway but how am i supposed to stop traffic? Ahhhh we are lazy buggers no need just get ya ass into run gear ! And besides its the M1 its to busy and he dont want to wreck our little lovely truck !
BanditsVCops 1 year ago
@BanditsVCops lol. hope ya liked the vid mate.Thanks for the comment.
TheShiste 1 year ago
eh mate just missed ya,i was drivin yellow wagon,getcha nxt time
SuperDoodies 1 year ago
Don't know at what speed this video is taken, but that idiot should not be putting up the advanced on any Traffic Management. Everything has its limits and by the look of it there is no way those operatives could have got a traffic count to allow them to put that TM on. You want to get yourselves killed, go ahead, but don't include the rest of us.
jhh48 1 year ago
@jhh48 Lol The video was recorded at normal speed ,it was recorded about 7 yrs ago when health and safty was a little more relaxed, A time when ya just got the job done. As it happens 1st cone was 9.00 and we didnt start with the signs till 9.35 and yes we got the count.Not sure how long youv done tm im guessing 10 mins not 10 yrs. This was taken on the m1 and that particular stretch of road was very busy all the time,if we hadnt gone for it the contractor would STILL be waiting now.
TheShiste 1 year ago