Added: 2 years ago
From: gsgriffin
Views: 2,607
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (4)

Sign In or Sign Up now to post a comment!
  • More can be seen at the Facebook page called "Retractable Suspension Bridge". The actual bridge was constructed in 2008. It has since been retracted and extended twice. Each time, it took about 2 hour for 4 people to complete. Bridge is still performing well and due to the severe winter condition in northern Montana, it is expected to survive longer with the decking sections stored inside each winter.

  • Really cool. 

  • Amazing, look forward to putting it back together in a few weeks!

  • The actual bridge has now been built and works EXACTLY like the model...but 80' span instead of 80"

  • lol thats cool

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more