and now u have ot go to london victoria then run to waterloo and hope on to the train before going down the line about 6 hours or so when it use to be quicker well do SWT
With the commencement of the new timetable on December 9th South West Trains ceased operating to Brighton, this being a requirement of their new franchise. The Reading-Brighton and Brighton-Paignton services were the casualties.
and now u have ot go to london victoria then run to waterloo and hope on to the train before going down the line about 6 hours or so when it use to be quicker well do SWT
Buttercupline2 9 months ago
i was on that
ILOVELEEDS456 1 year ago
how long did it take 2 get 2 pton?
Aysome 3 years ago
about 4 & 1/2 hours
oashmole 3 years ago
Good stuff
Trowbridgejim 4 years ago
how come it was the last SWT at Brighton??
ryskinner 4 years ago
With the commencement of the new timetable on December 9th South West Trains ceased operating to Brighton, this being a requirement of their new franchise. The Reading-Brighton and Brighton-Paignton services were the casualties.
oashmole 4 years ago
Well done there. If I still took stills then I might have done something similar.
SulzerSupremo 4 years ago