Added: 11 months ago
From: phillydrywaller
Views: 35,402
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (24)

Sign In or Sign Up now to post a comment!
  • your too slow really a good drywall do 3000 sq ft everyday i do that room in less then 45 minute one buddy cut one buddy screw the guy who cut put 2 screw then go cut the next during the time the screwer screw all around the sheet and make sur everything is ready for the next sheet before he finish cut it that way you make money or you paid hourly maybye

  • Ok dude. Looks good! Does anyone know what would be an allowable gap between sheets of drywall? Is there any rule on gap spacing on beveled edges versus butt joints? Thanks!

  • Just a reminder, it would be a lot easier on both of you if you guys don't hold the sheet above your head at the far end of the sheet, creates a bad sag and creates heaviness.

  • great work. very professional. But, the man smoking in the room should no better.  Discourage smoking in you work area for health sake.

  • @thomasborboa1358 one man install isnt productive,same as topping out, cmon man,pretty quick=)

    

  • Pros hang ceiling first walls second. But where is the strapping on this job? Pros use strapping also

  • NOOOOOBBBBBSSSSSSS

    

  • LOL at the guy smoking, he haven't stop smoking since he started.

  • So other than being slower than old people fucking. . These guys are clearly not production hangers. But yes ceilings first, stagger butt joints keep recesses tight and learn your fricken offs dude! Hahha

  • I feel sorry for you guys, homeowner running around there all day. Pretty decent job for a couple of framers, lol.

  • Aren't you supposed to stagger the joints??? Just sayin

  • @Fyrjake051 yes, and we are staggering the butt joints. The tapered side of the sheet does not get staggered.

  • fast.....

  • SUPPOSED TO DO THE WALLS FIRST BUD

  • @hoydog33 , oh really? Maybe that's how you do it, I haven't met a pro yet who hangs walls before the ceiling.

  • @phillydrywaller lol im just messing with ya. ceilings first!!! nice work... could maybe have used another step on that scafold!! lol

    keep up the vids

  • @hoydog33, Im standing on the floor, my partner has a bench to stand on, and I do step up on it a few times.

  • @phillydrywaller HOW YOU TELL A KNOW IT ALL THAT CEILINGS FIRST.

  • @hoydog33 Lol no you arnt you fucken retard ???? lol

  • Get some 12 foot sheets...save you and the taper time, that guy on the gun is as usfull as tits on a bull. I wouldent hire you guys to drywall my dogs house.

  • @Lastbreath187 ....dosent fkn matter the room is other 12ft anyways ur still going to have the same amount of joints just diffrent places hahahahahah im a 16 year old drywaller and i could out run any of u

  • Comment removed

  • @hoydog33 hahah im a drywaller and u do the lid 1st dumb dumb :)

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more