Added: 8 months ago
From: Southeasternrentals
Views: 9,153
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (18)

Sign In or Sign Up now to post a comment!
  • this is why i weld a d-ring on the main boom..then u can stroke both pumps..

  • What about the guys in the hole?

  • brown pants day for that DUMBASS

  • Ok, why not take the bucket off and dead lift it. Also push the boom down so you don't go down the hole so much, I know easier said then done.

  • i have three words (use a crane) not a excavator

  • oh shit oh shit oh shit oh shit ooooooooooohhhhhhh sssshhhhhhiiiiiiiiiitttttttttt­!

  • Cleveland: oh! no no no no noooooo!

  • Oh wow. Knowledge about physics and some sense for machines could help.

  • totally agree

  • first off he has the boom way too high which was too much leverage on the machine, too much line, they should had it shorter, and the damn ground he was on was at a incline which is obvious way too much, when the tracks come up, i think its time for a damn crane., Come the F on, he should have leveled it OF seeing he had so much slack he could have made it ramp the other way to compensate the damn load without tipping over, thats just common sense if your a operator !

  • Looks like it was overloaded, and the suspended load was being held way too far away from the machines center. I'm all for pushing the envelope, but this was clearly a job for a crane. (or a hammer to break that chunk up a bit.)

  • Thanks

  • not sure but i'm glad i wasn't in the cab

  • Yeah it looks like it, so yeah thats a big machine to tip over.

  • Is that a 330B ?

    That should be a pretty big load to make this digger tip over ...

  • what happend?

  • Good Job Guys

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more