Added: 3 years ago
From: MNRRConductor2006
Views: 5,690
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (5)

Sign In or Sign Up now to post a comment!
  • Wow, your trains really are slow.

  • The Diesels run the Montauk Branch, and typically take the mainline to the split at Bethpage. That is Babylon Brach Train.

  • This looks like Roseadale, just before the split......That train was going through St. Albans....years ago there used to be a stop called Springfield Gardens

  • how do you know its a hot rail?

  • Is this 750v dc? And how far between the subatations (1.5 to 5 miles (alumimium conductor rails)) in UK.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more