Added: 3 years ago
From: ChicagoTribune
Views: 6,596
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (9)

Sign In or Sign Up now to post a comment!
  • Hey Jeanne Gang, two questions. With all of the exterior glazing, how does the building meet Energy code? And, the cantilevered concrete balconies look great, but ,can't wait to see what they look like in 5-10 years after freeze/thaw cycles.

  • yo does anybody knows what day it will resume

    The Chicago Spire

  • Hmmm their building fast at Chicago, but New York their building slow?

  • okay so theres TWO building going up?

    this and the SPIRE tower?

  • Nice timing for your "sexy" new condo monstrosity..

    "Starbucks to Close 600 Stores, May Cut 12,000 Jobs"

    "American Airlines Plans Nearly 7,000 Job Cuts"

    "L.A. Times to Cut 250 Jobs, 150 In Editorial"

    "U.S. private-sector employers slashed 79,000 jobs in June"

    "GM stock falls to lowest level since 1954"

  • In fairness, this building was in planning/development long before Starbucks/American Airlines/L.A Times/private sector/GM whipped out their respective hatchets. And lets face it: the people employed by the aforementioned employers were hardly in the marketplace for this level of housing. Can't you hear the siren's seductive calling of the rich?

  • not a fan of the buildings design. it has a very messy profile.

  • great

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more