Yer that's pretty good going.. I've done 1250m3 in 38 hours. That's my best but Its finding enough stuff like that in are area to do those volumes. Do you operate a harvester?
@MrTimberslayer yerr i do a 12 shift just production hours.. try to get 10 meters an hour, this was the worst bit to be honest. good to only have one spec though, as cutting stakes ect would really slow you down. what machine do u operate?
lol first thinnings are boring haha and dull does the logset have a auto fell button =]
TheMONTREYJACK1993 3 months ago
Yer that's pretty good going.. I've done 1250m3 in 38 hours. That's my best but Its finding enough stuff like that in are area to do those volumes. Do you operate a harvester?
MrJakefish 10 months ago
soz forgot to mension it was most windblow an some standing
TheMONTREYJACK1993 10 months ago
there is a harvester driver around where i live who did 3300 m3 in 10 days
TheMONTREYJACK1993 10 months ago
fair play 100 meters a day in pine ,must be a long day
MrTimberslayer 1 year ago
@MrTimberslayer yerr i do a 12 shift just production hours.. try to get 10 meters an hour, this was the worst bit to be honest. good to only have one spec though, as cutting stakes ect would really slow you down. what machine do u operate?
MrJakefish 1 year ago