Added: 1 year ago
From: zerozedzed
Views: 28,611
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (4)

Sign In or Sign Up now to post a comment!
  • Parts list please!

  • Hi guy, N1UUE here. I just viewed several of your 2 meter quad construction videos, I enjoyed it a lot. You have to admit that using PVC makes the project pretty simple once its all measured and the wire sized. My 10 meter 2 element version uses an 1.5 inch sched 40 because of the increase boom length and the wind loading. I thought about building a 2 meter version myself but 10 meters seemed to match my interest at this point. Great job. 73's Bob

  • @lostnmusik Congrats on your quad project and good DX! 73

  • Hi guy, N1UUE here. I just viewed several of your 2 meter quad construction project. I enjoyed it a lot. You have to admit that using PVC makes the project pretty simple once its all measured and the wire sized. My 10 meter 2 element version uses an 1.5 inch sched 40 because of the increase boom length and the wind loading. I thought about building a 2 meter version myself but 10 meters seemed to match my interest at this point. Great job. 73's Bob

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more