Added: 2 years ago
From: ewvjr1
Views: 7,301
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (15)

Sign In or Sign Up now to post a comment!
  • That is a gay bucket! I like how no arm guard was used on the field phase.the groundman should have fuck that blonde!

  • If lineman waited on the saftey man ever time, nothing would get done.....but this does appear to be a "traning" video sooooo...good work guys.

  • thats why elliot does all their work

  • shouldve slid them hoses together when he picked that phase up!

  • I wish we could have used the Altec to move phases in school, we had to do that shit by fucking hand on spikes!

  • I flag for electric companies and they do talk about what there going to do but not to the extent these guys do and the sleeves are to keep them safe 7500 volts is nothing to play with

  • keith buddy, you train the new guys like they are kids. Teach them to work safe and they will last long enough to be a bog tough boy like you dood.

  • yea it looks kinda stupid but it is a good rule to let every one in the loop. i've been on jobs WHERE NOT BEING IN THE LOOP with multable hands working got two guys electrocuted.we all know how crazy shit can happen. bad juju

  • stupid

  • wow...........what is BGE trying to do with the squeeks. make them like babies that need to be held by the hand. these kids want to be linemen not babies.

    un fucking real.............

  • @keithp74 thanks for the feedback

  • im all for safety but wtf is that?....and what are those things on those guys' arms.....?! sooo glad we dont have to wear sleeves

  • Are you kidding me you would get nothing done!

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more