Added: 2 years ago
From: 56076
Views: 18,093
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (12)

Sign In or Sign Up now to post a comment!
  • So THAT'S why these things are so rare - you've been buying them and cutting them up!

    Seriously, though, great looing train. I have an original 5-unit APT, with a power car I double-powered for better traction. And no, you can't have it!

  • Is it OO gauge?

  • I must admit that with all the couplings being original equipment you have managed

    far more than I ever did.The models I ran used to de-rail all the time when pushing

    them in the direction other than towing well done.The APT really does look the Biz

    as well.

  • APT real trains model is 14 coaches trains services! Amazing.

  • First Rate really first rate.I take you "must" have both the power cars wired to multiple with each other??.The detail you include is really incredible,I can see you have put many hours into this system.I would have thought that it would be very very

    easy to "de-rail" the Coaches from the front set,as I know all about these models

    from old.I also know that given the proper corrective fitment of parts the old Hornby couplers can be replaced with working ones!!!!!.

  • @flanneryged

    It is only a single "powered" power car, but it does have the guts of a Heljan 26 inside it rather than the original power unit.

    All the vehicles have been rewheeled which helps a lot with road holding. All couplings are original!

  • Ahh cool, thanks for the explination, was wondering how it was done, wow 5 sets, bet that was expensive lol

  • Wow! Nice one flippin' good videoing on that well done mate

  • Wow, my fleet of modern trains would love a run on that layout! Perhaps, you could continue uploading some videos with your stock running around?

  • Cool 5* & a fav.

  • fantastic. are all the bogies the split ones or is it only the windows that were changed?

    i currently have three sets and am looking to do a conversion

  • The bogies are the split articulated ones as supplied by Hornby, the formation is as close to prototypical as I could make it,

    To build the full 14 car set needed five of the Hornby 5-car sets, each additional set will produce two vehicles with articulated bogies at each end.

    next time we have the layout out I will try to get a side on veiw of the train passing more slowly.

  • Nice!!

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more