if any of you pros knew anything about pouring concrete, maybe you would think they were using a plastizier seen how it looked to me that they were on the slab in descend time , think about the options before you make a judgment , it obvious they are finishers or they likely would be using a power skreed
looks like a lot of fiil in a short distance to be pulling a plank off, and driving over with out creatting a mess. 3 guys, what 30 yards,good job guys!
it takes a 6'' slump before it starts losin strength.i have been doin this shit for 10 yrs.we use rebar or wire mat.pour 6'' slumps all the time.never any problems in the 10 yrs.when u guys that set at desk get out and work on sight and actually sees how shit works then will know the book isnt always right
that floor is too wet!! its does weaken the strength and if the excuse is that they didnt have enough guys or a pump maybe they should of left it to the pros!!!!!
do some home work extra water ex plant will weaken concrete!!!!
why do u guys bitch about it bein wet?u got a floor with frost footings all the way around .where the fuck is it gonna go?frost cant get in so how will it heave ,u guys dont know shit . quit talkin like u guys r crete masters.
Try raking that much with a 2or3 inch slump, man. There was what, 3 guys on that pour? They would have lost it in the (presumably) heat. But why stop at wire, go all our and use re bar!
Why does this say Led Zeppelin - Bring It On Home?????????????
mpwelk 1 year ago
Nice Oshkosh
backspacecows01 2 years ago
if any of you pros knew anything about pouring concrete, maybe you would think they were using a plastizier seen how it looked to me that they were on the slab in descend time , think about the options before you make a judgment , it obvious they are finishers or they likely would be using a power skreed
gw2741 2 years ago
i hate those front discharge trucks those drivers think they know what theyre doing but they suck
jaahut 2 years ago
looks like a lot of fiil in a short distance to be pulling a plank off, and driving over with out creatting a mess. 3 guys, what 30 yards,good job guys!
777tuck 2 years ago
better yet wet it up and let er fly
bruce45564 2 years ago
i would have left a 12 ft wide board out of form and drove right in with first truck
bruce45564 2 years ago
it takes a 6'' slump before it starts losin strength.i have been doin this shit for 10 yrs.we use rebar or wire mat.pour 6'' slumps all the time.never any problems in the 10 yrs.when u guys that set at desk get out and work on sight and actually sees how shit works then will know the book isnt always right
jrocha82 2 years ago
jrocha82 you dont know what day it is!!!
that floor is too wet!! its does weaken the strength and if the excuse is that they didnt have enough guys or a pump maybe they should of left it to the pros!!!!!
do some home work extra water ex plant will weaken concrete!!!!
guz04087 2 years ago
why do u guys bitch about it bein wet?u got a floor with frost footings all the way around .where the fuck is it gonna go?frost cant get in so how will it heave ,u guys dont know shit . quit talkin like u guys r crete masters.
jrocha82 2 years ago
Should have got a pump !! loads more easy
localboychris 2 years ago
Fibercrete maybe since no mesh. No ties for wall either. Odd. Awesome 12 foot power screes though. Nice video.
CablloBlanco 2 years ago
Ever think that the concrete has fiber mesh in it??
NJW1973 2 years ago
2 things wrong with that slab pour , poured it to wet and no wire reinforcement , thats a weak floor
bowtech333 2 years ago
Try raking that much with a 2or3 inch slump, man. There was what, 3 guys on that pour? They would have lost it in the (presumably) heat. But why stop at wire, go all our and use re bar!
darock420 2 years ago
ha i didnt even watch this but o well hahaha good job!!!
C1rcaBoy13 3 years ago
yeah good job indeed, keep them videos coming!
dvwart 4 years ago
Vary good work! Great song to use too.
DominickBlack 4 years ago