5:56 another joint with slightly off-axis sections (about 1/2 inch). Liquid collecting behind joint. 22 feet from cleanout. Camera was able to "hop" to the next section of pipe.
7:25 two off-axis sections of pipe. downstream section is about 3/4 inch higher than upstream section, creating a "dam" with a 1/2 inch deep reservoir of liquid behind it. Camera could not be forced to "hop" into the next section. Distance approx. 34 feet from cleanout.
0:15 unusual wall obstruction between segments of pipe.
PipeCamOne 2 years ago
5:56 another joint with slightly off-axis sections (about 1/2 inch). Liquid collecting behind joint. 22 feet from cleanout. Camera was able to "hop" to the next section of pipe.
PipeCamOne 2 years ago
0:50 roots still visible in cleanout column
PipeCamOne 2 years ago
0:30 standing water at bottom of cleanout column.
PipeCamOne 2 years ago
7:25 two off-axis sections of pipe. downstream section is about 3/4 inch higher than upstream section, creating a "dam" with a 1/2 inch deep reservoir of liquid behind it. Camera could not be forced to "hop" into the next section. Distance approx. 34 feet from cleanout.
PipeCamOne 2 years ago
4:05 entering the main "straightaway"
PipeCamOne 2 years ago