Added: 10 months ago
From: Gilles31390
Views: 31,966
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (11)

Sign In or Sign Up now to post a comment!
  • maybe im missing something but why not start cut from other end of bench so your not swingimg towards, damn near over the cab of the trucks?

  • Yeah he's not bad but room for improvement,should be loaded in a min ten.

  • the 345 is one nice machine to run !

  • muito bom....

  • Great video!

  • Operator has talent on the sticks. However, He needs a small amount of tweeking on machine managment of motion. 1) Dont dig off the bottom every time. If you take your cut in two levels and only reach half way down half the time will increase your cycle time by 25%. Thats big money anyway you look at it. 2) Trucks take priority your bench was far enough out front load the trucks first.3) Get on those drivers butts about not stopping and going soon enough. it will knock 5-8 sec off load times.

  • This seems very fast for such a big machine, Good operator.

  • very fast for big machine ! nice

  • nice man

    you are a great opertor

    good job

  • Good job and good operator...

  • Bien la Video tu en aurais une de la 974 ?

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more