Nice work, but as a pro, you should know that this machine is a compact tracked loader, not a skid steer. Calling this a skid steer is like calling your excavator a backhoe.
@RHMproduction I've had good luck with mine. A 140 is a good size, not to big but not too small. IF your looking for something to really move dirt get a 150
@letsdig18 I build houses so I need something thats not too big. My cousin, also a builder has a 150. Its a great machine, but weight is a factor when it comes to backfilling around block walls.
@ Mattmurray You have obviously never had to purchase your own piece of equipment. My Tak cost half whose asv's do and would put it up against any of them. And as for parts I can pick up the phone and have anything I need the next day!
I traded a bobcat t190 for a Takeuchi tl140 and it was one of the best things I've done for my company. The bobcat was constantly broke down and the Takeuchi can run circles around it!
all the other machines are over rated compared to an asv,and parts wise their almost impossible to get parts and even harder to work on ,iknow cause i used to be a mechanic at a heavy equipment dealership and we just quit dealing with these pos's.
I own two asv's an rc 85 and a pt 100 and pound for pound these takecrappies can't touch them in quality,performance,or shear power,as for traction thats a forgone conclusion, Asv is the best out there with caterpillar second(they use asv drives)but takeuchi is just a shit machine for broke or cheap contractors.
I guess the secret of that even spreading is just getting the bucket angle exactly right each and every time you tip. You have certainly mastered that one, brilliant
Any one can run those gehls and taks and look like good. They couldnt make it any easier.
1000+ hours on the one we got. Done alot of snow work on hot top and concrete and alot of work on all kinds of rough material. Complete origional bottom, tracks included.
Had to replace the tracks and sprockets at 700hrs. So far only 4 rollers total at 1200 hrs. The mud we work in is bad for locking up the rollers and wearing them flat.
yeah we have two case 450ct's the one we got about 900 hours out of the tracks,front and rear idlers. Then has to replace the front idlers again at 1300. The other one we had so many problems with case let us swap/trade for a new one.
what do you think i should get to make dirt jumps for a bike?
meos12 7 months ago
anyone use a tak for finish grading? how would it compare to a cat 277? im looking at a 140
MHgrading 8 months ago
This work it is possible to observe infinitely
d1gger900 8 months ago
looks easy good job
cachetes156 10 months ago
good job!! very nice :)
Kulexy 10 months ago
Why he's painting all the road in blue??? He's gonna have troubles I think!..
NeptunianAngel 10 months ago
What's that??????????
NeptunianAngel 10 months ago
Haha funny !! ;)
claasjaguar960 10 months ago
Almost sounds like asv under carrige
Cat312lb 10 months ago
I love takeuchi. ran one for the first time the oother day and it wasn't like anything I've ever ran
frozenfarm 10 months ago
you've done that before
esb372 1 year ago
I'd hire you.
nemo227 1 year ago
Nicely done! That li'l bugger can move can't it!? :)
danboynz 1 year ago
Nice work, but as a pro, you should know that this machine is a compact tracked loader, not a skid steer. Calling this a skid steer is like calling your excavator a backhoe.
biggseye 1 year ago
@biggseye And yet, people do it.
Hawkins203 1 year ago
Oh fuck ya, thats that good shit.
SHPUDY 1 year ago
south Carolina ??????
RANDYSTREX500 1 year ago
is it the video or is the stone blue in color.............
RANDYSTREX500 1 year ago
credit where credit is do...you got some real skill runnin' that 150. nice job hoss.
ugotbawlz 1 year ago
A real pro,,,
The72696061 1 year ago
nice work, did you have to roll it out afterwards ?
ronnied828 1 year ago 3
@ronnied828 sure did!
letsdig18 1 year ago
@letsdig18 bobcat,caterpillar,volvo,case,komatsu and john deere have more machines than takeuchi
eureka800 1 year ago
@letsdig18 did the area get paved?
sanitaire800 1 year ago
how much does doing a job like this pay?
spadgeful 1 year ago
How far are you overlapping the stone?
MustangWW2 1 year ago
Im considering a 140, would you recommend?
RHMproduction 1 year ago
@RHMproduction I've had good luck with mine. A 140 is a good size, not to big but not too small. IF your looking for something to really move dirt get a 150
letsdig18 1 year ago
@letsdig18 I build houses so I need something thats not too big. My cousin, also a builder has a 150. Its a great machine, but weight is a factor when it comes to backfilling around block walls.
RHMproduction 1 year ago
if u want to move some real dirt TL250 . the property i work on just got one. still trying to get use to it . its just a to big and slow haha
astro1218 1 year ago
@letsdig18 no enclosed cab?
eureka800 1 year ago
is that the company warehouse? what company do you work for or own?
jcobaltss2005 1 year ago
pretty gr8 spreadin it. if that was me. by the time im dune it would look like a blue sand dune, hills and all...lol
GoldenShaolinNutz 1 year ago
FAST!
Ls7colorado 1 year ago
Nice job man!
SotaEngineering 1 year ago
You made it look easy. Nice work.
jampmayer 1 year ago
nice
Cryptocracyz101 1 year ago
@ Mattmurray You have obviously never had to purchase your own piece of equipment. My Tak cost half whose asv's do and would put it up against any of them. And as for parts I can pick up the phone and have anything I need the next day!
Aross147 1 year ago
I traded a bobcat t190 for a Takeuchi tl140 and it was one of the best things I've done for my company. The bobcat was constantly broke down and the Takeuchi can run circles around it!
Aross147 1 year ago
nah mate sorry not the same thing at all.....check out some of his other vids,he knows how to level something when he needs to!!
MRpositrack 1 year ago
it looks faster than the case ,,,, the case i ran had like 3500.00 worth of track roller idlers ect at 600 hrs,, so ur not alone in that
tomie695 1 year ago
all the other machines are over rated compared to an asv,and parts wise their almost impossible to get parts and even harder to work on ,iknow cause i used to be a mechanic at a heavy equipment dealership and we just quit dealing with these pos's.
MrMattmurray 1 year ago
I own two asv's an rc 85 and a pt 100 and pound for pound these takecrappies can't touch them in quality,performance,or shear power,as for traction thats a forgone conclusion, Asv is the best out there with caterpillar second(they use asv drives)but takeuchi is just a shit machine for broke or cheap contractors.
MrMattmurray 1 year ago
I would love to check the levels after this guy says he has "levelled " the stone
maturerobph 1 year ago
@maturerobph where does he mention 'levelling' the stone??
MRpositrack 1 year ago
@MRpositrack in the UK, we say leveling stone meaning spreading stone, Same thing surely ?
maturerobph 1 year ago
@lazarman1102766
case 90xt....end of story
WhitereddoG 1 year ago
I have a mustang 2044 but i would love to have one of those. I think Bobcats are over rated. Great job.
RAL239 1 year ago
it´s very fast *0* and this sound when it´s drovet
23BajaOutlaw 2 years ago
top job, good spreding
keynesey 2 years ago 2
Comment removed
pottsisback 2 years ago
I guess the secret of that even spreading is just getting the bucket angle exactly right each and every time you tip. You have certainly mastered that one, brilliant
K9TMD 2 years ago 14
Bobcat doesn't come close to the takeuchi
cat365330 2 years ago
what kind of rock is that?
kyler309 2 years ago
I do have a real machine, its in the video!
letsdig18 2 years ago 37
Shit, your a hell of a operator.
Rozexcavatordriver 2 years ago 3
Great spreading!
Xx69roadrunnerxX 2 years ago
your good
hudyfootball 2 years ago
nice operating shit machine
XCrankedvoltx23 2 years ago
oh man you rule.....I wish I could spread stone like that..!!
d00by2 2 years ago
dude awesome ideaa
FFcorbs 2 years ago
hey thats the same lot the guy came down haulin ass in the Big Mack
Jerald9000 2 years ago
UNBELIEVABLE ive never seen somebody do this. and im speechless. unbelievable great work wish i could give u more than 5 stars lol great work 5*
serboiz1995 2 years ago
how have you never seen anybody do this? you must not be a heo.
excal29292 2 years ago
hahaha na i mean ive never seen anybody do it aswell as chris.
serboiz1995 2 years ago
good job mister, you are right on the money! 5 stars here!
trashratt 2 years ago
This driver is good! Must have some time behind the sticks.
wrduckclub 2 years ago 4
I've heard Taks ride really rough on hard surfaces, rougher than any fixed roller CTL.
This true?
WillieWonka928D 2 years ago
yeah the ride it pretty rough on hard ground, concrete or asphalt just plain suck lol
letsdig18 2 years ago
Any one can run those gehls and taks and look like good. They couldnt make it any easier.
1000+ hours on the one we got. Done alot of snow work on hot top and concrete and alot of work on all kinds of rough material. Complete origional bottom, tracks included.
Diggerkid 2 years ago
This is a real pro operator! fun to watch!
SparalOy 3 years ago 2
nice job but im can do better and faster on my bobcat s250
arturik123456 3 years ago
what yall was making
beasley57 3 years ago
Good job. What kind of luck have you had with the rollers on the undercarrige.
case450ct 3 years ago
Had to replace the tracks and sprockets at 700hrs. So far only 4 rollers total at 1200 hrs. The mud we work in is bad for locking up the rollers and wearing them flat.
letsdig18 3 years ago
yeah we have two case 450ct's the one we got about 900 hours out of the tracks,front and rear idlers. Then has to replace the front idlers again at 1300. The other one we had so many problems with case let us swap/trade for a new one.
case450ct 3 years ago
Pretty cool!! Good job!
CataniaD6Kfan 3 years ago
Man !
If you arn t a pro - nobody is
Gasteraner 3 years ago
Thanks I do the best I can with what I've got!
letsdig18 3 years ago
how cold is it there now? still working eh? lucky you!
abbottwtf 3 years ago
It was proablay 60 that day, probably be in the 50"S this week. Its rains just about every other day so its really wet out.
letsdig18 3 years ago
lol...the skidsteer looks funny when its moving fast
Rikuno94 3 years ago
oh I guess that is why u laid the gravel as a base for the asphalt.
killerxxx14 3 years ago
What is that going to be a pond??
killerxxx14 3 years ago
It's a parking lot.
letsdig18 3 years ago