Added: 3 years ago
From: letsdig18
Views: 143,403
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (85)

Sign In or Sign Up now to post a comment!
  • what do you think i should get to make dirt jumps for a bike?

  • anyone use a tak for finish grading? how would it compare to a cat 277? im looking at a 140

  • This work it is possible to observe infinitely

  • looks easy good job

  • good job!! very nice :)

  • Why he's painting all the road in blue??? He's gonna have troubles I think!..

  • What's that??????????

  • Haha funny !! ;)

  • Almost sounds like asv under carrige

  • I love takeuchi. ran one for the first time the oother day and it wasn't like anything I've ever ran

  • you've done that before

  • I'd hire you.

  • Nicely done! That li'l bugger can move can't it!? :)

  • Nice work, but as a pro, you should know that this machine is a compact tracked loader, not a skid steer. Calling this a skid steer is like calling your excavator a backhoe.

  • @biggseye And yet, people do it.

  • Oh fuck ya, thats that good shit.

  • south Carolina  ??????

  • is it the video or is the stone blue in color.............

  • credit where credit is do...you got some real skill runnin' that 150. nice job hoss.

  • A real pro,,,

  • nice work, did you have to roll it out afterwards ?

  • @ronnied828 sure did!

  • @letsdig18 bobcat,caterpillar,volvo,case,­komatsu and john deere have more machines than takeuchi

  • @letsdig18 did the area get paved?

  • how much does doing a job like this pay?

  • How far are you overlapping the stone?

  • Im considering a 140, would you recommend?

  • @RHMproduction I've had good luck with mine. A 140 is a good size, not to big but not too small. IF your looking for something to really move dirt get a 150

  • @letsdig18 I build houses so I need something thats not too big. My cousin, also a builder has a 150. Its a great machine, but weight is a factor when it comes to backfilling around block walls.

  • if u want to move some real dirt TL250 . the property i work on just got one. still trying to get use to it . its just a to big and slow haha

  • @letsdig18 no enclosed cab?

  • is that the company warehouse? what company do you work for or own?

  • pretty gr8 spreadin it. if that was me. by the time im dune it would look like a blue sand dune, hills and all...lol

  • FAST!

  • Nice job man!

  • You made it look easy. Nice work.

  • nice 

  • @ Mattmurray You have obviously never had to purchase your own piece of equipment. My Tak cost half whose asv's do and would put it up against any of them. And as for parts I can pick up the phone and have anything I need the next day!

  • I traded a bobcat t190 for a Takeuchi tl140 and it was one of the best things I've done for my company. The bobcat was constantly broke down and the Takeuchi can run circles around it!

  • nah mate sorry not the same thing at all.....check out some of his other vids,he knows how to level something when he needs to!!

  • it looks faster than the case ,,,, the case i ran had like 3500.00 worth of track roller idlers ect at 600 hrs,, so ur not alone in that

  • all the other machines are over rated compared to an asv,and parts wise their almost impossible to get parts and even harder to work on ,iknow cause i used to be a mechanic at a heavy equipment dealership and we just quit dealing with these pos's.

  • I own two asv's an rc 85 and a pt 100 and pound for pound these takecrappies can't touch them in quality,performance,or shear power,as for traction thats a forgone conclusion, Asv is the best out there with caterpillar second(they use asv drives)but takeuchi is just a shit machine for broke or cheap contractors.

  • I would love to check the levels after this guy says he has "levelled " the stone

  • @maturerobph where does he mention 'levelling' the stone??

  • @MRpositrack in the UK, we say leveling stone meaning spreading stone, Same thing surely ?

  • @lazarman1102766

    case 90xt....end of story

  • I have a mustang 2044 but i would love to have one of those. I think Bobcats are over rated. Great job.

  • it´s very fast *0* and this sound when it´s drovet

  • top job, good spreding

  • Comment removed

  • I guess the secret of that even spreading is just getting the bucket angle exactly right each and every time you tip. You have certainly mastered that one, brilliant

  • Bobcat doesn't come close to the takeuchi

  • what kind of rock is that?

  • I do have a real machine, its in the video!

  • Shit, your a hell of a operator.

  • Great spreading!

  • your good

  • nice operating shit machine

  • oh man you rule.....I wish I could spread stone like that..!!

  • dude awesome ideaa

  • hey thats the same lot the guy came down haulin ass in the Big Mack

  • UNBELIEVABLE ive never seen somebody do this. and im speechless. unbelievable great work wish i could give u more than 5 stars lol great work 5*

  • how have you never seen anybody do this? you must not be a heo.

  • hahaha na i mean ive never seen anybody do it aswell as chris.

  • good job mister, you are right on the money! 5 stars here!

  • This driver is good! Must have some time behind the sticks.

  • I've heard Taks ride really rough on hard surfaces, rougher than any fixed roller CTL.

    This true?

  • yeah the ride it pretty rough on hard ground, concrete or asphalt just plain suck lol

  • Any one can run those gehls and taks and look like good. They couldnt make it any easier.

    1000+ hours on the one we got. Done alot of snow work on hot top and concrete and alot of work on all kinds of rough material. Complete origional bottom, tracks included.

  • This is a real pro operator! fun to watch!

  • nice job but im can do better and faster on my bobcat s250

  • what yall was making

  • Good job. What kind of luck have you had with the rollers on the undercarrige.

  • Had to replace the tracks and sprockets at 700hrs. So far only 4 rollers total at 1200 hrs. The mud we work in is bad for locking up the rollers and wearing them flat.

  • yeah we have two case 450ct's the one we got about 900 hours out of the tracks,front and rear idlers. Then has to replace the front idlers again at 1300. The other one we had so many problems with case let us swap/trade for a new one.

  • Pretty cool!! Good job!

  • Man !

    If you arn t a pro - nobody is

  • Thanks I do the best I can with what I've got!

  • how cold is it there now? still working eh? lucky you!

  • It was proablay 60 that day, probably be in the 50"S this week. Its rains just about every other day so its really wet out.

  • lol...the skidsteer looks funny when its moving fast

  • oh I guess that is why u laid the gravel as a base for the asphalt.

  • What is that going to be a pond??

  • It's a parking lot.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more