Added: 1 year ago
From: nondescriptcitizens
Views: 1,227
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (4)

Sign In or Sign Up now to post a comment!
  • The project was started by the Washington Public Power Supply System in 1977. The construction of the facility was halted in 1983 due to cost overruns, along with a slowing of electricity demand growth, led to cancellation of two plants and a construction halt on two others. Moreover, the agency defaulted on $2.25 billion of municipal bonds, which is still the largest municipal bond default in U.S. history. The monumental court case which followed took nearly a decade to fully resolve.

  • Awesome. Shame they never finished the plant. It could have produced a tremendous amount of electricity for everything from Portland to Bellingham.

  • my brother-in-law works at BMT northwest in the huge building between the towers. the inside is massive and the sub-levels are just as amazing.

  • Great footage have more I would love to visit this place.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more