Added: 3 years ago
From: frherald
Views: 4,207
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (4)

Sign In or Sign Up now to post a comment!
  • The water seeps through?

    Is there a problem with water coming up from under the road?

    A properly patched and sealed repair should last for years.

  • high dollar truck but a toy roller

  • The problem with the IR machines is that the edges of the repair are falling apart after about 6 months. I think what is happening is people using the IR are not adding enough oil into the asphalt & not raking in the oil all the way to the edges. Love the thought of these machines but I will stick with what I know works & that is a cut out.

  • 5 men being used for what should be a eay 2 man operation! The worst thing is at 0.29 - the blacktop is on fire and the labourer is checking to see if the asphalt is heated enough!!!

    I know that the guys are still getting used to the process but what about some training or supervision by someone with some IR experience.

    Good luck with the IR process - great when applied correctly and in the correct situation.

    Ron

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more