Added: 2 years ago
From: dermanator007
Views: 1,639
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (9)

Sign In or Sign Up now to post a comment!
  • You need your own show...lol.

  • At the begining of the video you can see all the new wood they used to reprofile the top part of the ride. Sadly when testing the trains were going way too fast for todays safety standards. This was built with exact blueprints from the original rides built in the 1920's. Sigh.

  • Just kidding..anybody who likes Knoebels...is ok with me! :)

  • did you swallow helium?

  • thanks i love you too... just having lots of fun "riding" the flying turns...

  • @badumpy lol

  • I went there in May and it still wasn't open. WTH is taking them so long?!?!!?!?! Construction started in like 2006 or 2007

  • A number of things. There doing it all in house, so give them props. No other park could do a job like this in house.

  • LOL I can't wait to ride this someday, maybe it'll wait til I get back to PA lol. Shame they had to re-track the trough to the station and move the transfer track. I hope they finalized the train design, very curious after I saw the few designs on the track before.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more