This video is completely incredible ! I've never seen in my life or in another video a tunnel as long as this ! But I whould like to be sure to understand it all : it is a tunnel who's supposed to avoid the city just up of this ? Finally what was the first goal of this tunnel ?
And so, are japan's roads all new everywhere like that ? it's incredible ! They're also really clean and general maintenance is well.
Up of this tunnel is Yamate street. But there were many buildings around the Yamate street. So construction cost by tunnel is lower than elevated highway.
Yamate tunnel is not finally complete. This tunnel will connect to Shuto expressway line 1 in 2013 (called Central Circular 2 Shinagawa Line).
This movie's tunnel is very new, opened in Mar, 2010. Other roads are not so clean.
I made the Google map (please see description), This movie is Oohashi JCT to Nishi-Shinjuku JCT.
参考になりました。ありがとうございます。
suzuka0207 2 months ago
目が回る。
kexxau65 4 months ago
god bless japan
seems need for speed --> play station
gliese5812 11 months ago
Is this expressway totally underground or it has elevated section?
Very impressive!
blws7021 1 year ago
@blws7021 Thanks for the comment.
This expressway (Metropolitan Exp.) is the most elevated. This is only a part of the tunnel.
wataken777 1 year ago
This video is completely incredible ! I've never seen in my life or in another video a tunnel as long as this ! But I whould like to be sure to understand it all : it is a tunnel who's supposed to avoid the city just up of this ? Finally what was the first goal of this tunnel ?
And so, are japan's roads all new everywhere like that ? it's incredible ! They're also really clean and general maintenance is well.
Greetings from Montréal, Canada.
Franks4488 1 year ago
@Franks4488 Thanks!
Up of this tunnel is Yamate street. But there were many buildings around the Yamate street. So construction cost by tunnel is lower than elevated highway.
Yamate tunnel is not finally complete. This tunnel will connect to Shuto expressway line 1 in 2013 (called Central Circular 2 Shinagawa Line).
This movie's tunnel is very new, opened in Mar, 2010. Other roads are not so clean.
I made the Google map (please see description), This movie is Oohashi JCT to Nishi-Shinjuku JCT.
wataken777 1 year ago