Added: 3 years ago
From: greenpiling
Views: 33,658
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (10)

Sign In or Sign Up now to post a comment!
  • CALL LBFOSTER COMPANY FOR ALL YOUR STEEL PILING NEEDS

    LBFOSTER.com

  • Perp vs Par is a mute point cause that guy is a rook. HOW do you thread sheets with a mobile one purpose pile driving machine is key? Unzip yer fly and build a better pile driving machine.....but let us know the details so we can bid based on your stats. Lets get some chatter goin on this.

  • Way too techie for simple stuff. Can that rig thread sheets? Why are the tracks perpendicular to the sheeting line. Too techie.

  • @YaterSpoon86 how would the machine move on to the next pile if he wasnt perpendicular to the sheeting line

  • @Bones1977ify How does that rig thread sheets? That's half the battle as you know.  Perpindicular takes time to adjust.

  • better if you had include more lenght

  • whos that shit driver?

  • can this be used to replace existing retaining walls:?

  • ensure slack on hammer rope before starting hammer mate!!!!

  • asasa

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more