Added: 3 months ago
From: CMRSclub
Views: 1,260
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (20)

Sign In or Sign Up now to post a comment!
  • wow, done well !!!

    Harry

  • Amazing you can tell alotta work has been put into this........it has a lot of "DETAILS" lol just picking on ya great job tho can't wait to see an operateing video

  • It is coming right along.Everything is looking great.

  • Great video!!

  • You guys are doing some great work on the layout! Can't wait until the Venture Crew comes back in February! I really like the branchline too, I think every club layout should have one. I plan on becoming a member there, after I learn how to drive, and convert at least one of my locomotives to DCC.

  • @SierraRailway

    Thanks!! if your nearby come through and take a look at the club, plenty of members including myself would be happy to help you convert a non DCC engine to DCC!!

  • word of the day: "details" hahahahah sweet update can't wait to see the trains running!!!!

  • That is a lot of cool stuff you've got on the layout! On the first part of the video I like how the sky backdrop was curve outward! the structures are amazing, I mean everything is amazing!!!

  • @retrainrun

    Thanks!

  • do you have to pay to be a member? i was gonna join silicon valley lines until i found out its 20 bucks a month

  • @morepassionfoo

    Yes you have to pay to be a member our price is the same. Having members pay is what helps the club pay for benchwork, electronics, maintence and everything else that makes up the club. The price is low but the benifits are incredible! You learn soo much being in a club, such as learning about dcc, benchwork, trackwork, and all the other aspects of model railroading! Try it out it cant hurt

  • @CMRSclub thats a pretty good point. silicon valley is a smaller club however, in fact its almost done

  • How many boosters does the layout use?!?!?!!

  • @TaylorUPBNSF

    Around 25-30 boosters that are currently on the layout!

  • Very nice layout! I love all your videos! Very nice to see you posting again. If you can get recordings of the session tomorrow, that would be fantastic! I am part of virtual railroading with the same standards as real railroads, and enjoy the operation, but have never seen a model railroad session! I'd love to see the video if its possible for you to get some.

  • @Conrail45

    Thanks for watching!! At the moment our operation videos might be really simple, plain, no signaling, not much dispatching. This is because alot of our members have never done operations and since we dont have all the signals thats out the equation. Since we are still in the planning stages of operations you will see in our operating video that I'm working on thats its mainly showing people how to shuffle cars and gett them ready for trains.

  • Looks Great! What are the cards resting on the freight cars for?

  • stopsign997

    They are waybills. During an op-session, they tell the operator where the cars are dropped off and spotted.

  • @SierraRailway

    yup!

  • @stopsign997

    The next day we had a operating session, they are sorta like way bills for the cars, at the moment we dont have pokects to store them we are still trying out new things for the club and introducting new and old members into operations

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more