Added: 2 months ago
From: AREVAmultimedia
Views: 579
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (2)

Sign In or Sign Up now to post a comment!
  • Impressive! Nice Animations! Great to see Nuclear Power as clean an efficient Energy rising.

  • 2:20 I was always intrigued by how the EPR design has the RPV brought in after the containment was fully built. Apparently the vessel internals are also installed in modular units after the vessel is put in place.

    3:46 These transitions are also head-turning. The so-called "4D" modeling of the entire construction process is something I've heard a lot about and I think the idea is that it will reduce the risk in these new builds.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more