Added: 1 year ago
From: MrNFortune
Views: 3,942
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (9)

Sign In or Sign Up now to post a comment!
  • vou chamar o ibama kkk

  • So the mill is right on the ball, no waiting for them to finish their donut?

    I ran the electric Hood crane inside a chipper mill for a while.

    Had to take the 2-3 cord a minute from the drum and get it to feed into the chipper along with the stuff being fed straight in from the ring...talk about busy!

  • @effinghamhick i bet you were busy we stay preaty busy to got 5 machines and 3 workers plus trucking and tinkering every so often we have to wait in line at the mill but not vary much, what mill did you work at?

  • How often do you bang the stakes with the heel? I'd have hell trying not to..

    And what's the off-load time at the mill? I'd sure hate waiting around for it.

  • @effinghamhick when your in the loader if you try and load strait on the tier your working on its alot easyer, it takes about a half hour to get unloaded

  • What is time consuming is cutting 18 ft. logs for crane mats. You can only do 1 at a time.

  • @Grishals15 yea slashin pine is the same way

  • That was awesome to watch

  • @CDNcatskinner thanks its time consuming to slash 8 foot wood but it pays the bills haha

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more