Added: 4 years ago
From: mx270a
Views: 17,654
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (26)

Sign In or Sign Up now to post a comment!
  • so fucking loud while working inside one of them

  • what did the worker hook onto the hydrolic at 3:40?

  • @howesilomontage The hydraulic cylinders on the jacks aren't as tall as the rings, so they go up as far as they can, we pin the jack in place, lower the cylinders, reattach them to a different part of the jack, and raise them again. Have to do that twice to go up the height of one ring.

  • @mx270a

    thanks

  • @howesilomontage. The jacks that I build will lift 2 rings at a time before you need to change them. We build bins up to 135 foot diameter. Typically a 105 foot bin I will need 35 jacks and can go two rings at a time and can lift a ring in a matter of minutes even on the 30th ring. Crew of 7 guys we can put up a 105 foot diameter 32 rings high with side draw, ladders, walkway on roof in about 2 weeks or so.

  • @harleyglide2008 hello. i'm from Russia. we are looking for jacks like yours. please, send me the contacts where i can buy it. thanks

  • While you guys do your piss-in-the-snow contest, just want y'all to know it's a beautiful early SUNDAY morning up here in Saskatchewan CANADA while an expert-or-otherwise crew assemble Weststeel bins . . about 200 ft from our frikken bedroom window . . 125dB NOISE LEVEL . . if only you'd all go to Germany as xxpjhxx challenged . . or maybe Mexico . . heck, even Pakistan . .

    and do your thing there . . Anywhere . . except outside our bedroom window!

    If only! LOL

  • @guitarman71084 We aren't professional bin builders. Also, it is generally bad form to act like a prick when trying to sell your services.

  • That has to be the slowest raising of a grain bin I have ever seen!! Get some real jacks. Email me and I will build a set that can lift that little bin in about 30 seconds.

  • That would save me ~30 minutes per bin. Not cost effective for one bin per year, particularly when you're borrowing the jacks.

  • yea i build bins in alberta to

  • We build 105s and 155s. Thats a big tank! just got done with a 105.

  • I build CMC bins. biggest our 4 person crew dose is 30ft. we use hand crank jacks. we get our bins up in a day. come back the next to do the flooring

  • Comment removed

  • really? that's cool. We mostly work with Westeel where I work, I mainly work on air floors and Grain Legs tho.

  • you guys are just fuckin slow get some better jacks and get that thing up!!!!!!!

    btw i build brock bins for a living so yes i do know what i am talking about.

  • We put up one bin per year, so, yeah.

  • With an attitude like that I would never let your young foul mouth but up one of my bins.

  • Comment removed

  • @DramaTubeFag Well, Fag I don't think I would put up your bins. Just a little too busy building 55 bins this year and 60 on tap already for next year. Peace out I gotta build some bins.

    and before the snide comebacks come out we do 36 -72 ft bins using the bainter jacks and hand crank jacks for anything under 30ft

  • jacks are pretty slow but other than that its alright i grain bin too

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more