Added: 3 years ago
From: shanehuish
Views: 3,187
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:
see all

All Comments (4)

Sign In or Sign Up now to post a comment!
  • When Busch Gardens got rid of the Wolf, part of me went with it because it was the first roller coaster I ever rode, so you could say I had an emotional attachment to it.

  • I loved this ride.It was like the Ninja at Magic Mountain in Calif.Both rides were torn down.:( Someone said the BBW ride was costly to maintain.

  • was this ride designed by schwarzkopf? i know it's an arrow, but Anton had been developing this since 1983 and it's rumored that 3/4 of the 'Flungbahn' was produced. since they had to cancel mid-production, which would have been maybe late 1983/early 1984, i don't think arrow would have had enough time to engineer it but only too manufature it because ron toomer had been qouted saying it took arrow an average of 12 months to design and manufacture/construct a coaster

  • R.I.P Big Bad Wolf

Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more