Added: 3 years ago
From: arossona
Views: 57,382
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (4)

Sign In or Sign Up now to post a comment!
  • hi, just wondered, how did they secure the framing to the concrete? Ryan

  • @rjsaunders92 Ryan, there are a couple of ways. Shear straps on the shear walls are embedded during concrete(see our foundation videos) and then nailed to framing in accordance with specs. Also, bolts are embedded during foundation process where the walls will be. Bottom plate is drilled to allow embedded bolts to be fastened. If during inspection, straps or required bolts are missing, they have to be "retroed". That requires drilling the concrete and installing bolts with an epoxy adhesive.

  • Excellent video and voice representation.

  • Nice video. Thanks for posting

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more