Added: 2 years ago
From: MortensonConstruct
Views: 18,016
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (2)

Sign In or Sign Up now to post a comment!
  • There are many examples of 4D. Most are used to seeing a building being constructed from excavation, foundation, structure and enclosure systems being installed over time based on the construction schedule which we refer to as a Macro level. This example is the same process, but is a smaller and more defined scope of the construction schedule which we call a Micro level 4D. This micro level 4D is much more successful with planning scopes of work.

  • how is this 4D??

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more