@1000bluejoe Ideally, the ground should be level across the width of the Polytunnel but the length of the structure can be built on slope either way. When the ground levels are uneven, the foundation tubes in the lower level can be left protruding further above the ground by up to 15cm. Hope this helps. However, if you have any further questions please do not hesitate to call our technicians on 01282 601253. Thank you for watching our videos.
Dont you need to level off the area first ?
1000bluejoe 6 months ago
@1000bluejoe Ideally, the ground should be level across the width of the Polytunnel but the length of the structure can be built on slope either way. When the ground levels are uneven, the foundation tubes in the lower level can be left protruding further above the ground by up to 15cm. Hope this helps. However, if you have any further questions please do not hesitate to call our technicians on 01282 601253. Thank you for watching our videos.
polytunnels 6 months ago
That is dangerous man. Put your eyes on where you are hammering, not the camera.
aladdeen1 10 months ago