Added: 2 years ago
From: BluelineConstruction
Views: 39,848
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (15)

Sign In or Sign Up now to post a comment!
  • Excellent.  Can you tell me where you ventedt the macerator too?

  • Did u fix ?

  • Good explanation

  • wow lazy plumbers, put ejector pit in. but then the concrete would need to be broken. lazy

  • @shauntampa Its thousands cheaper and does the same job.

  • Is that radiant heat behind the mirror?

  • if you vent your dehumidifier into your bathroom vent, what will stop the humidity form the dehumidifier exiting back into the bathroom when the fan is not on ?

  • So you can use the those plstic pipes for the tiolet drain instead of the metal sewer pipe? You answer is apprreciated. thank you

  • @karma8chic Modern homes are built with plastic PVC for sewer drains as a opposed to metal piping.

  • Where did you tie in the vent pipe?

  • This particular basement had radiant heating in the slab as well as a sewer main at aproximately 30 inches above the finished floor heaight of the basement so sawcutting of the floor and gravity sanitary waste were not options. If the sewer main was below the finished grade of the floor than I would expect the costs of saw cutting and patching to be about the same as a grinder. Hope this helps.

  • how expensive is this system compared to cutting up the slab and installing pipes underground? I really like the fact you don't need to cut up the floor.

  • Thank you very much!  Answered my questions in great detail!

  • This is a very helpful video. Thank you Blueline!

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more