The central rail tracks are used to gauge locomotives of metric (1 meter), while the side rails are used by rail locomotives of large gauge (1.6 meters). Big´s locomotives of gauge metric run smoothly, with C-C tricks, and big´s locomotives of the railway Estrada de Ferro Vitória-Minas(EFVM), run the metric gauge, tricks with B+B-B+B. Until!
Comment removed
segantiniluisandre 2 years ago
Hello
The central rail tracks are used to gauge locomotives of metric (1 meter), while the side rails are used by rail locomotives of large gauge (1.6 meters). Big´s locomotives of gauge metric run smoothly, with C-C tricks, and big´s locomotives of the railway Estrada de Ferro Vitória-Minas(EFVM), run the metric gauge, tricks with B+B-B+B. Until!
RicardoFrontera 3 years ago
Nós não uso muito gira. Nice vídeo, Por que há 4 carris? eles bitola estreita comboios correr tão bem?
pwalpar 3 years ago
MUITO BOM. NOTA 10.
josecarlosfarina 3 years ago
Obrigado! Valeu!
Abraços!
RicardoFrontera 3 years ago