Added: 2 years ago
From: rwjenkins
Views: 2,626
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (7)

Sign In or Sign Up now to post a comment!
  • How long did it take you to build? Any hand machining or all CNC?

  • @paullubliner It was built by Paul Huntington, all of it is good old-fashioned hand machining. Everything is made from scratch except for the drivers (bought as rough castings that required finish machining and assembling on the axles) and the pressure gauge. I believe it took him about a year and a half to build it.

  • @paullubliner Glad to hear that. If he'd have done the drivers from scratch, there'd have been no compromises at all! Even down to spoke cross section, my personal pet peeve.

  • beauitful

    

  • Coal- or Butane-fired??

  • @steved0689 It's alcohol-fired.

  • @rwjenkins cool thanks. this locomotive looks like a piece of art!

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more