Added: 5 months ago
From: herehiscry
Views: 3,098
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (9)

Sign In or Sign Up now to post a comment!
  • how many high rise buildings have been demolished in CHCH now?

  • :)

  • Final outcome see SBS House Cristchurch

  • Jim Boyd in Christchurch New Zealand working for Ceres Enviromental NZ Operating a High Reach 145Ft of Long Stick Connected to the power house 385c Cat, with Video feed , and end stick water for dust suppression, and Tilt cab that elevates for Operator Comfort and an in depth look at the task of demoing a 9 storie Building.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more