Added: 2 years ago
From: ferriedeckers
Views: 10,977
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (3)

Sign In or Sign Up now to post a comment!
  • Cycle times may not be matched and line may not be balanced but It definitely is single piece flow. The Cell starting point is with the raw material and has to have inventory. In between work stations Work In Process (WIP) is minimal though ideally it could be one. The basic underlying principle in single piece flow manufacturing is; 'Man can wait Machine can wait but material should not wait to begin with.

  • This is NOT one piece flow! Operator 2's cycle time is faster than operator one. These is batch production going on with operator 1, 2, 3 and 4. Good thing you have plenty of WIP in place waiting for the next operations. Look at all the inventory sitting around waiting at each operation. Come on guys, you can do better than this.

  • Where are you're safety glasses??

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more