@ady0003 hehe.. not quite, "Day 2" on the video means the 2nd day in the lab. We made the beams and cured them in a water bath for 20 days (ideally should have been 28 days but were running out of time) before testing
@jonr5000 I had to dig up the old report for this, the tensioned one failed at 16.5kN and the non-tensioned one at 13.8kN, we expected the results to be further apart originally
well do guys :)
Profkhairy2022 2 months ago
in a day you had hard concrete....?
ady0003 6 months ago
@ady0003 hehe.. not quite, "Day 2" on the video means the 2nd day in the lab. We made the beams and cured them in a water bath for 20 days (ideally should have been 28 days but were running out of time) before testing
2ShanW 5 months ago
What were the final figures on the breaking point of tension vs non-tensioned?
jonr5000 6 months ago
@jonr5000 I had to dig up the old report for this, the tensioned one failed at 16.5kN and the non-tensioned one at 13.8kN, we expected the results to be further apart originally
2ShanW 5 months ago
great job guys
omogaju 7 months ago