Thats insane how many ppl operate this becuase usually there like spike pullers, etc and the spikers usually take a long time depending on how many they have to spike. nice video man make more of this machine
This a concrete tie machine. It takes the old rail off the ties, scoops up the old ties and places them in gondolas. It then smooths out the road bed, lays concrete ties down, and places new rail on top of the concrete ties (the old rail is usually picked up for later use because most of the time it's still good.). It also places clips to hold the rail down instead of spikes.
What are sleepers?
lightitonfire244 2 months ago
Forty MORE guys outta work, lol.
FrigginEngineer 2 months ago
This is the Matisa P95 renewal train from Strukton Rail replacing sleepers and rail. See the internet site from Strukton Rail for more information
p1962m 1 year ago
Comment removed
p1962m 1 year ago
Comment removed
p1962m 1 year ago
Comment removed
p1962m 1 year ago
Comment removed
p1962m 1 year ago
I like Holand
wernerfrisio 1 year ago
das ist wie eine Koenigin die viele Arbeiter um sich herum hat und die sie gut ernaehren.
wernerfrisio 1 year ago
If i would of never seen this video, i would of never thought this was possible
jcdebbs 2 years ago
Hello
je construit ces machines en Suisse a Matisa SA a Crissier
c est beau de les voir en action
teamror 2 years ago
Plasser&Theurer. cool machine.
kdlehel 2 years ago
hey does this machine take up old rail and lay in new plus spike it all up or ???? what does it do ??
Travide 3 years ago
Yes,machine take up old rail and lays new rails and spikes.
dutchtrainmanserie22 3 years ago
Thats insane how many ppl operate this becuase usually there like spike pullers, etc and the spikers usually take a long time depending on how many they have to spike. nice video man make more of this machine
Travide 3 years ago
muito bom...otimo.
jose98089 2 months ago
This a concrete tie machine. It takes the old rail off the ties, scoops up the old ties and places them in gondolas. It then smooths out the road bed, lays concrete ties down, and places new rail on top of the concrete ties (the old rail is usually picked up for later use because most of the time it's still good.). It also places clips to hold the rail down instead of spikes.
viccarr78664 3 years ago