Very good video mate. Thanks heaps for uploading, the L's are really good, it is a shame that L1162 can't run out on the mainline these days. But she will return some day, sometime.
The lack of electrified mainline for it to run on will be the most serious impediment to that happening, but I know what you mean. I guess high-speed runs to Pakenham may still be possible in the future.
I lived at Longwarry in the 1980s and saw the Ls in their final 7 years of operation.
I doubt we'll even see that (high speed runs) - Steamrail aren't even allowed to go at a decent speed with the two K classes on either end. The speed the red rattler is doing at the 3:00 mark is much faster than what they do in the Glen Waverley and the Camberwell to Mitcham shuttles.
Thank you for a brilliant video. I wish I'd been there.
jamesclements997 10 months ago
i think 1162 is now in the old newport vr workshops
the124Lscania 1 year ago
@the124Lscania Yes, it was based there (with Elecrail) back when this video was made too.
emdB67 1 year ago
Omg that V/Line is electric how many of these operated
mattmanroxs 2 years ago
@mattmanroxs
Only had the one line....
Now the overhead lines had been taken off..
Ken69a 2 years ago
Yeah,what seems like the bees knees one day is gone the next. Everything changes.
mick47willis 2 years ago
my father joseph willis drove the first electric train to warragul 21 july 1954
mick47willis 2 years ago 3
Wouldn't be many that can say that.
I'm sure that nobody on that day could've thought it would all be end 44 years later.
emdB67 2 years ago
Very good video mate. Thanks heaps for uploading, the L's are really good, it is a shame that L1162 can't run out on the mainline these days. But she will return some day, sometime.
G516R700 2 years ago
The lack of electrified mainline for it to run on will be the most serious impediment to that happening, but I know what you mean. I guess high-speed runs to Pakenham may still be possible in the future.
I lived at Longwarry in the 1980s and saw the Ls in their final 7 years of operation.
emdB67 2 years ago
I doubt we'll even see that (high speed runs) - Steamrail aren't even allowed to go at a decent speed with the two K classes on either end. The speed the red rattler is doing at the 3:00 mark is much faster than what they do in the Glen Waverley and the Camberwell to Mitcham shuttles.
Heihachi73 2 years ago