Added: 1 year ago
From: SuperChicken13
Views: 6,143
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (10)

Sign In or Sign Up now to post a comment!
  • hello, adderall - we have a job to do.

  • 1:03... NO OPEN BEVERAGES IN SERVER ROOMS

  • @DeathsOverture good thing the AC condensor was in the room to leak all over the floor too then... :(

  • i like how he stands there for a few seconds thinking "Fuck where do i start here" lol

  • whats the white switch on the wall with the blue cables in it? :S

  • @basmagic It is a 4-port Balun box, connecting the server rack to the primary networking closet via 4x1GB Cat6 runs aggregated into 2 LACP trunks (2x2GB bandwidth and VLAN trunks)

  • @basmagic Its a white switch on the wall ! LoL

  • Really nice cabling job! Those Liebert's really give your rack 250 mins of runtime? Impressive!

  • @xxkinetikxx Yeah, we can gain another 100 minutes by shutting down the xServe. It is not very efficient.

  • This is what I seriously have to do to mine. Looks a lot better after the rewire. These companies want everything done so quick and no downtime, that it gets challenging. I have a full Dell server rack full of Dell servers and tripplite ups

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more