This part of the line is continuous welded rail, but the maximum authorized speed from the north yard limits of Palmer to MP 162.2 is 55/40 regardless of whether a stretch is welded or jointed (provided permanent or temporary speed restrictions don't further limit speed).
@Seaboard1321 No, the NYS&W B40-8s had K5Hs and were beautiful sounding. Alas, these units were on a 15 year lease and have been long returned to CSX.
@llokuta I knew the B40-8's where on lease, just didnt know how long. Ive heard Susquehanna's F45's with K5HR24's before, so I was just guessing. What did they come with when they got them new?
@llokuta Oddly enough, four of them are now on the Providence and Worcester as their 4001-4004. They were originally NYSW 4004, 4008, 4006 and 4002 respectively.
@CRQ5508 I'll be up at Foxwoods next week (7/5 and 7/6). What are the prospects for catching something over on the NECR by Mohegan Sun? Maybe I'll even see the ex-NYS&W B40s???
@llokuta I have no idea about that area to be honest. The only time I've ever seen the Providence and Worcester is when they come up to New Hampshire on coal trains. I've never railfanned the NECR for that matter either. Not since I was a kid. The B40s and B39s can be found almost everywhere on the PW system, so you never know. During the week, you have better luck catching something.
Guilford is a joke they had a chance to pickup 16 sd60 units ex-up cnw but being tight wade's the disregarded it .You see the power they have worn out Canadian gp40-2w units and a fleet of fornout gp40 units.The patriot corrdor wont help them they operate just like Mcginnis changce the name slap on some paint and we have a new railway.
Thank you, but nope track speed for freights is 40 and that train was loaded so even with the SD70M and Dash-8 they couldn't have been doing 60 if they wanted to
Awesome vid. Why doesn't Guilford move this fast? On the MBTA Haverhill Line it seems like they hardly ever go faster than 25 mph ON SHORT TRAINS. The longer ones go even slower. It doesn't make sense because the track speed must be around 60 mph because the commuter rail and downeaster really get moving. After they clear Lowell Junction I wish they'd pick up the pace.
That's because all Guilford's power sucks :P actually I've wondered that myself. I know the track speed from Ballardvale to Bradford is 60MPH, but Guilford never moves anywhere close to that speed.
haha. Yeah I've often heard Guilford doesn't maintain their equipment very well. I almost always see Guilfords in Andover so I don't know if they speed up at all after that but they certainly could move at a pretty good clip all the way to Portland. I have a video of Guilford trains in the late 80s and there was a clip of one flying over the bridge at Haverhill at about 40 mph. I was so suprised.
Man, they were moving! Awesome video 5* great K5LA and good to see the yellow SD70M's still in use since they got rid of em on the NYSW. Here's hoping they get the cowl 45's up there too!
That's true. The two crossings in Cushman Corner are very close together. I guess the engineer tried to fit in a long-long-short-long, a small hornshow, and the next long-long-short-long, but the last long ended up after he already passed the grade.
Two of em are the Vermonter trains which are always the same. The other two are NECR which don't tend to stick to an exact schedule and usually come when I have classes. I was really lucky to get this train and Susie-Q, I got a heads up from someone in NH who saw the train going south.
Yeah, I'd say it's a sub-standard track all right! I've never seen a locomotive bounce like that!
KaiserHudson67 1 week ago
railfans.. :') get a a life fuck heads
redgriffin7598 1 month ago
the train was bouncing
shawty19891 2 months ago
The sad thing about these 70M's is that all three are down here in Binghamton rotting away in a storage line with SD40's & some other NYSW power
kittycraft 2 months ago
Wicked!!! Love it!!!
dwkcamman611 3 months ago
great catch!
conrail6600 11 months ago
Wow! Great Catch! I agree, K3LA.
K5H13760 1 year ago
That is rather fast for sub-standard track. But cool either way.
cu29640 1 year ago
This part of the line is continuous welded rail, but the maximum authorized speed from the north yard limits of Palmer to MP 162.2 is 55/40 regardless of whether a stretch is welded or jointed (provided permanent or temporary speed restrictions don't further limit speed).
TNT314159 1 year ago
I thought the NYSW has K5H's on their SD70M's?
Seaboard1321 1 year ago
4050 & 4054 have K5LLAs and 4052 has an RS5T
TNT314159 1 year ago
@TNT314159 LOL an SD70M with an RS5T? Thatd be awesome!!
Seaboard1321 1 year ago
Actually its a pretty bad horn, at least when I heard it last year :P
TNT314159 1 year ago
@TNT314159 Did you get a video?????
Seaboard1321 1 year ago
@Seaboard1321 No, the NYS&W B40-8s had K5Hs and were beautiful sounding. Alas, these units were on a 15 year lease and have been long returned to CSX.
llokuta 10 months ago
@llokuta I knew the B40-8's where on lease, just didnt know how long. Ive heard Susquehanna's F45's with K5HR24's before, so I was just guessing. What did they come with when they got them new?
Seaboard1321 10 months ago
@llokuta Oddly enough, four of them are now on the Providence and Worcester as their 4001-4004. They were originally NYSW 4004, 4008, 4006 and 4002 respectively.
CRQ5508 8 months ago
@CRQ5508 I'll be up at Foxwoods next week (7/5 and 7/6). What are the prospects for catching something over on the NECR by Mohegan Sun? Maybe I'll even see the ex-NYS&W B40s???
llokuta 8 months ago
@llokuta I have no idea about that area to be honest. The only time I've ever seen the Providence and Worcester is when they come up to New Hampshire on coal trains. I've never railfanned the NECR for that matter either. Not since I was a kid. The B40s and B39s can be found almost everywhere on the PW system, so you never know. During the week, you have better luck catching something.
CRQ5508 8 months ago
Sounds like a K3LA or a K3HA
BNSF2184 1 year ago
Guilford is a joke they had a chance to pickup 16 sd60 units ex-up cnw but being tight wade's the disregarded it .You see the power they have worn out Canadian gp40-2w units and a fleet of fornout gp40 units.The patriot corrdor wont help them they operate just like Mcginnis changce the name slap on some paint and we have a new railway.
rve61 1 year ago
Very nice! But they are doing well over 40mph. Thats gotta be about 60.
t3hsully1985 2 years ago
Thank you, but nope track speed for freights is 40 and that train was loaded so even with the SD70M and Dash-8 they couldn't have been doing 60 if they wanted to
TNT314159 2 years ago
amazing, and still with NYSW number and lettering
NJT4111 2 years ago
Awesome video 5*****
dutchtrainmanserie22 2 years ago
Awesome vid. Why doesn't Guilford move this fast? On the MBTA Haverhill Line it seems like they hardly ever go faster than 25 mph ON SHORT TRAINS. The longer ones go even slower. It doesn't make sense because the track speed must be around 60 mph because the commuter rail and downeaster really get moving. After they clear Lowell Junction I wish they'd pick up the pace.
gp40mc 2 years ago
That's because all Guilford's power sucks :P actually I've wondered that myself. I know the track speed from Ballardvale to Bradford is 60MPH, but Guilford never moves anywhere close to that speed.
TNT314159 2 years ago
haha. Yeah I've often heard Guilford doesn't maintain their equipment very well. I almost always see Guilfords in Andover so I don't know if they speed up at all after that but they certainly could move at a pretty good clip all the way to Portland. I have a video of Guilford trains in the late 80s and there was a clip of one flying over the bridge at Haverhill at about 40 mph. I was so suprised.
gp40mc 2 years ago
If they're moving too slow, take a video and then speed up the video :P
TNT314159 2 years ago
haha. Good idea!
gp40mc 2 years ago
Man, they were moving! Awesome video 5* great K5LA and good to see the yellow SD70M's still in use since they got rid of em on the NYSW. Here's hoping they get the cowl 45's up there too!
TrainiacProductions 2 years ago
Thanks Kyle!
TNT314159 2 years ago
1:00 - You're suppose to sound your horn as you go through the crossing, not after you've passed it.
jph0917 2 years ago
That's true. The two crossings in Cushman Corner are very close together. I guess the engineer tried to fit in a long-long-short-long, a small hornshow, and the next long-long-short-long, but the last long ended up after he already passed the grade.
TNT314159 2 years ago
NICE!
yonkersrails 2 years ago
Good Job baby!
MsTNT0304 2 years ago
oh, well, you need to get the 4 trains a day, lol
Railfan108 2 years ago
Two of em are the Vermonter trains which are always the same. The other two are NECR which don't tend to stick to an exact schedule and usually come when I have classes. I was really lucky to get this train and Susie-Q, I got a heads up from someone in NH who saw the train going south.
TNT314159 2 years ago
that line doesnt get much use does it?
Railfan108 2 years ago
Not as much as I'd like. 4 trains per day Monday - Saturday and 2 trains per day Sunday. Other sections of the line have more activity though.
TNT314159 2 years ago
Great Shot!
MainlineProductions1 2 years ago
It's Amazing How Fast They Go Through Here. It's Interesting How They Stalled On The Hill With Dry Rails!
skyman2002 2 years ago
I thought so too, the cars must have been really loaded down.
TNT314159 2 years ago
Very cool.
CSXRP 2 years ago
Sweet, K5LA or K5H?
BNSFbeagrett9647 2 years ago
Thanks, most likely a K5H, but I'm not 100% sure.
TNT314159 2 years ago
awsome horn!!
acelaboy123 2 years ago
Sweet shot!
hawkeyetherailfan 2 years ago
Great horn.
Trainlover4ever2006 2 years ago
Nice SD70M!!!
falko73 2 years ago