i worked there both last week and last year, the difference between the two was unbeleviable! first time, i tore apart the rotted florr, no drywall, huge amounts of dirt and bad things. last week looks like a completed building the same floors i tore apart are now beautiful wood flooring.
I was there, about a month after this video was posted. My Joint Missionary team (of two churches) we ran VBS for the kids. I was in charge of games for the kids, the field in back wasn't mowed but we still made do and everything turned out a big success. God Bless Camp Restore, and God Bless the people of the Lower 9th Ward who will be its members when it reopens.
i worked there both last week and last year, the difference between the two was unbeleviable! first time, i tore apart the rotted florr, no drywall, huge amounts of dirt and bad things. last week looks like a completed building the same floors i tore apart are now beautiful wood flooring.
namo713 1 day ago
I was there, about a month after this video was posted. My Joint Missionary team (of two churches) we ran VBS for the kids. I was in charge of games for the kids, the field in back wasn't mowed but we still made do and everything turned out a big success. God Bless Camp Restore, and God Bless the people of the Lower 9th Ward who will be its members when it reopens.
southparkfan2717 4 months ago