Added: 4 years ago
From: dvmiller1
Views: 9,172
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:
see all

All Comments (7)

Sign In or Sign Up now to post a comment!
  • Yes, lock 7. It has been operational for 5 or 6 years now but was down for many years before that.

  • I'm guessing this is at lock 7?? I noticed last time I was there. That there was a power station. I didn't think it was operational though.

  • If Synced with the mains means the main field ignited, yes. You can monitor these generators online for the specs. The same 1920s GE generators are used up stream at Dix Dam and produces much more power with the much higher head of Herrington Lake.

  • It sounds like it was synced with the mains at 0:44

  • Wow, the sound is insane. Haunting. Eerie. Beautiful.

  • I agree, there's nothing more wonderful than that hum and harmonics of a large generator!

  • I wouldn't consider that a large generator

Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more