Steel Erectors:MDI, Divison of Louisbourge SBC, Ironworkers local 765 Ottawa
Bridge info, Facts: Length of bridge from abutment to abutment = 1,017ft(310m) Heaviest girder wt.= 115,000lbs
Center span closure lift: 12 girder bolted splice assembly- Length = 318ft(97m)- Width=35ft(10m)- Depth= 12.5ft(3.6m) - Weight of assembly= 850,500lbs (425 Imp.Tons)
Height of lift from barge= 60ft - duration of lift= 8hrs- center span closure lifted as a four girder assembly off a Galcon barge
The765iw 1 year ago
50'x180'x5' section barge assembly with scan-am hydraulics inc. jacking systems consisting of 16-35ton jacks and jack rods.
- construction engineering and lift procedures by MDI and Infinity engineering group ltd. and DPHV
Comment removed
princessallie22 1 year ago
looks rusted before its built
MegaADAM132 10 months ago
This has been flagged as spam show
Steel Erectors:MDI, Divison of Louisbourge SBC, Ironworkers local 765 Ottawa
Bridge info, Facts: Length of bridge from abutment to abutment = 1,017ft(310m) Heaviest girder wt.= 115,000lbs
Center span closure lift: 12 girder bolted splice assembly- Length = 318ft(97m)- Width=35ft(10m)- Depth= 12.5ft(3.6m) - Weight of assembly= 850,500lbs (425 Imp.Tons)
Height of lift from barge= 60ft - duration of lift= 8hrs- center span closure lifted as a four girder assembly off a Galcon barge
The765iw 1 year ago
50'x180'x5' section barge assembly with scan-am hydraulics inc. jacking systems consisting of 16-35ton jacks and jack rods.
- construction engineering and lift procedures by MDI and Infinity engineering group ltd. and DPHV